In accordance with Section 182A of the Planning and Development Act 2000, as amended, we, Greener Ideas Limited intend to apply to An Bord Pleanála for permission for a period of ten years, in relation to the following proposed development in Profile Park, Baldonnel, Dublin 22.

The development will consist of a 110kV electrical substation and associated grid connection, comprising of:

  • EirGrid/ ESBN Control Room building
  • Associated Internal 15kV and 110kV Underground Cabling
  • Installation of a 15/110kV Transformer (TRAFO) with associated equipment including:

o    Cable Sealing End

o    Surge Arrestor

o    Earth Disconnect

o    Current /Voltage Transformer

o    Circuit Breaker

  • 110kV underground cable to Barnakyle 110kV substation 3 No Power Ducts and 2 No Telecoms Ducts.
  • Diesel Generator
  • Security Fencing, Security Cameras and Poles
  • Lights/Lamp Poles
  • Lightning Masts
  • Temporary Construction Compound
  • And all other associated site development plant and equipment and other works including surface water and foul

wastewater drainage, within an overall redline boundary measuring approximately 2.6 hectares.

An Environmental Impact Assessment Report (EIAR) accompanies this application. The proposed development will connect the adjacent approved Profile Park Gas Fired Power Plant (SD21A/0167) to the existing electricity transmission system.